How Long Does It Take to Design a Website?

Published on
February 1, 2026

How Long Does It Take to Design a Website?

"How long does it take to design a website?" is one of the most common questions clients and stakeholders ask, and one of the most difficult to answer definitively. The honest answer—"it depends"—isn't satisfying but is accurate. Website design timelines range from a few days for the simplest projects to many months for complex ones, with countless variables affecting where any specific project falls on that spectrum.

Understanding what drives timeline variation helps you estimate more accurately for specific projects. The scope of work matters enormously: a simple landing page differs from a complete business website, which differs from a complex e-commerce platform or web application. The complexity of design, the amount of content, the availability of stakeholders for feedback, the need for custom functionality—all these factors compound to determine actual project duration.

This guide breaks down website design timelines by project type and complexity, examines the factors that accelerate or extend timelines, and provides frameworks for estimating your own projects. Whether you're a designer quoting projects or a client planning a launch, realistic timeline expectations set projects up for success rather than frustration.

Let's look at what actually determines how long website design takes.

Timeline Ranges by Project Type

Different types of websites have dramatically different typical timelines. Understanding these ranges provides a starting point for estimation.

Simple landing pages (1-2 pages focused on a single purpose) can often be designed in one to two weeks if content and branding already exist. These projects have limited scope, straightforward structure, and minimal complexity. A designer with established templates and efficient processes can move quickly through discovery, design, and implementation for projects this small.

Standard business websites (5-15 pages including home, about, services, contact, and related pages) typically take four to eight weeks. These projects require more extensive discovery to understand the business, more content development, and more design work to cover the various page types. The timeline allows for stakeholder feedback and revision cycles that smaller projects might skip.

E-commerce websites vary enormously based on catalog size and functionality complexity. A simple shop with a few dozen products might take six to ten weeks. Complex e-commerce with extensive product catalogs, advanced filtering, custom checkout flows, and integration with inventory or fulfillment systems might take three to six months or longer.

Custom web applications requiring significant custom functionality typically take three to twelve months depending on complexity. These projects involve substantial development work beyond standard website design and often require more extensive planning and iteration.

Large corporate websites with extensive content, multiple stakeholder groups, and complex requirements often take six months to a year or more. These projects involve organizational complexity that extends timelines beyond pure design and development effort.

Factors That Affect Timeline

Numerous factors either accelerate or extend website design timelines. Understanding these helps you estimate specific projects more accurately.

Scope and complexity directly affect duration. More pages take more time. More complex page layouts take more time than simple ones. Custom functionality takes more time than using existing solutions. Unique design versus template-based approaches affects effort. Clearly defined, limited scope enables faster completion; expansive or poorly defined scope extends timelines.

Content readiness significantly affects total timeline. Design can proceed only so far without actual content. Projects where content exists and is ready to integrate proceed faster than those requiring content creation. When clients provide content slowly—and this is extremely common—timelines extend accordingly. Many delayed projects are delayed not by design work but by waiting for content.

Stakeholder availability and feedback speed affect timeline through review cycles. If stakeholders respond to design reviews quickly, projects move forward smoothly. If stakeholders are unavailable, take weeks to provide feedback, or require many revision rounds, timelines extend substantially. A project with one stakeholder who provides prompt, decisive feedback progresses faster than one with multiple stakeholders who take weeks to align on direction.

Revision rounds extend timelines based on how many cycles of feedback and revision the project requires. Simple projects might need one or two rounds; complex projects with many stakeholders might require many more. Clearly aligned expectations and good initial discovery reduce revision needs; misalignment and inadequate discovery extend them.

Technical requirements affect development timeline. Standard CMS implementation differs from custom development. Integration with external systems adds complexity and time. Migration from existing platforms requires data transfer and testing. Custom functionality requires development and debugging time.

Typical Phase Durations

Breaking projects into phases helps estimate total timeline by understanding how long each phase typically takes.

Discovery and strategy typically takes one to two weeks for standard projects, longer for complex ones. This phase includes understanding requirements, researching users and competitors, and establishing project direction. Rushing discovery often extends later phases through misalignment and rework.

Information architecture and wireframing typically takes one to three weeks depending on site size. This phase defines page structure, content organization, and layout frameworks. Larger sites with more pages and complex navigation take longer.

Visual design typically takes two to four weeks, sometimes longer for sites requiring extensive exploration or having many stakeholders. This includes style direction, page mockups, and design system development. Complex brands or multiple stakeholders requiring alignment extend this phase.

Content development runs parallel to design but often takes longer—sometimes much longer. If content doesn't exist and must be created, add weeks or months depending on volume. This is often the most underestimated phase because people assume content will just appear when needed.

Development typically takes two to six weeks for standard sites, longer for complex ones. This includes front-end implementation, CMS setup, and any custom functionality. Development timelines depend heavily on technical complexity.

Review and testing typically takes one to two weeks for thorough QA across browsers and devices, user testing, and final revisions before launch.

Common Timeline Scenarios

Realistic timeline scenarios illustrate how these factors combine in practice.

The rush project: A small business needs a simple five-page website in three weeks. This is achievable if content already exists, stakeholders are immediately available for quick feedback, the design is relatively straightforward, and everyone prioritizes speed. It requires compressed review cycles and limited revision scope—essentially getting it right the first time.

The typical small business site: A standard business website with about ten pages, modest content requirements, and typical stakeholder involvement takes six to eight weeks. This allows time for proper discovery, two rounds of design revision, content gathering that takes longer than hoped, and thorough testing before launch.

The complex e-commerce project: An online store with hundreds of products, custom filtering, integration with inventory systems, and extensive customization takes four to six months. The scope is larger, technical complexity is higher, and the coordination required for successful e-commerce extends everything.

The enterprise website: A large company with many departments, extensive content, complex approval processes, and high design expectations takes nine to twelve months. Organizational complexity, stakeholder alignment, and content volume all extend timelines beyond what the pure design and development work would require.

How to Estimate Your Project

For your specific project, work through these considerations to estimate timeline.

Define scope clearly. How many pages? What functionality? How complex is the design vision? What platform and technical requirements apply? Clear scope is the foundation of timeline estimation; vague scope produces vague estimates.

Assess content readiness. Does content exist or must it be created? Who is responsible for content? How long will they need? Content delays are the most common cause of missed deadlines. Build generous buffer for content unless it's already complete.

Consider stakeholder dynamics. How many stakeholders need to approve work? How available are they? How aligned are they likely to be? More stakeholders and less availability means longer feedback cycles.

Account for your capacity. Are you working on this project full-time or alongside others? Is development done by you or handed to others? What's your realistic daily output? Timeline estimates must reflect actual available capacity, not theoretical maximum.

Build in buffer. Projects rarely proceed exactly as planned. Build contingency into your estimate—20-30% buffer is often appropriate. This buffer absorbs the unexpected without requiring timeline extensions.

Setting Realistic Expectations

Timeline expectations should be realistic rather than optimistic. Unrealistic timelines create stress, quality compromises, and disappointed clients.

Communicate clearly about what affects timeline. Help stakeholders understand that scope, content, and their own responsiveness directly impact how long the project takes. This creates shared ownership of timeline outcomes rather than putting all responsibility on the design team.

Don't overpromise to win projects. Quoting faster timelines than realistically achievable may help win projects but creates problems when reality intervenes. Honest timelines that are met build trust more effectively than optimistic timelines that are missed.

Document assumptions in estimates. Make clear what must be true for your timeline to hold: content delivered by a certain date, feedback provided within specified windows, scope remaining as defined. When assumptions are violated, timeline impacts become understandable rather than surprising.

Plan for launch timing strategically. If there's a firm launch date (an event, a product launch, a marketing campaign), work backward from that date to determine whether timeline is feasible. If it isn't, adjust scope or timeline before starting rather than discovering impossibility mid-project.

Conclusion

How long it takes to design a website depends on project type and complexity, content readiness, stakeholder dynamics, revision rounds, and technical requirements. Simple landing pages might take one to two weeks; complex enterprise sites might take a year. Most business websites fall somewhere in the four to twelve week range, with actual duration depending heavily on content and feedback speed.

Realistic timeline expectations start with clear scope, honest assessment of all factors, and appropriate buffer for the unexpected. Rushed timelines lead to quality compromises or deadline failures. Generous timelines that are met build trust and produce better outcomes.

For your next project, work through the factors covered here to develop your estimate. Define scope clearly, assess content readiness honestly, consider stakeholder dynamics realistically, and build appropriate buffer. Then communicate your estimate with the assumptions that underlie it, creating shared understanding of what affects whether the timeline holds.

Share this post
Copied to Clipboard
faq

Frequently Asked Questions

Is my website feedback data secure and private ?
Do I need to install code snippets or browser extensions for Commentblocks?
Can I leave visual feedback on mobile or responsive designs?
How is Commentblocks different from other website feedback tools?
Do clients need to be tech-savvy to use Commentblocks?
Get started within Seconds

Ready to collect feedback the right way?

Everything you need to know about using our AI assistant, from setup to security. Still curious? Drop us a message and we’ll get right back to you.
Tick Icon
Free 14-Day Trial
Tick Icon
No Credit Card Requires
Tick Icon
Cancel anytime